Project Description
Construction measure Start 02/2019 (Duration 26 months)
– Refurbishment and strengthening bridge over Rhein, Speyer (Salierbrücke)
– Construction company: BWS Rhein-Neckar GmbH
– Hydrodemolition service provider: Wannenwetsch, Robot (2.050 bar, 155 l/min)
– Expected amount of wastewater about 6.000m³ for discharge into the Rhein
– Reprotex in combination with activated carbon filter for separation of PCB/PAH