Project Description
Construction measure in 05/2015
– Removal of a concrete rail track bridge pillar in the course of refurbishment
– Hydrodemolition service provider Idroservice Italia
– Robot (1.200 bar, 200 l/min), 60m³ demolition material
– 720 m³ recycling water from 100m³ provided water