Project Description
Project duration 09/2016
– Refurbishment of Alzkanal (section 8, outlet tunnel 2)
– ARGE Alzkanal Maintenance, Hydrodemolition by Wannenwetsch* and MüWatec**
– 1 robot* (1000 bar, 170 l/min) / 2 hand lances** (2.300 bar, 20 l/min)
– 468m³ wastewater treatment for recycling use