Project Description
Construction measure 04/2014
– Refurbishment of bridge construction by means of hydrodemolition
– Robot (1.200 bar, 200 l/min)
+43 (0)732 9015 67 00 | office@reprotex.com
Construction measure 04/2014
– Refurbishment of bridge construction by means of hydrodemolition
– Robot (1.200 bar, 200 l/min)