Project Description
Construction measure 10/2013
– Cutting of lateral grooves into runway
– Water-cooled milling drum and wet vacuuming of 162m³ removal
– 1.600m³ wastewater for recycling and drain
+43 (0)732 9015 67 00 | office@reprotex.com
Construction measure 10/2013
– Cutting of lateral grooves into runway
– Water-cooled milling drum and wet vacuuming of 162m³ removal
– 1.600m³ wastewater for recycling and drain